?該項(xiàng)目是我公司承接的第一個 BOT 項(xiàng)目,處理水量 50000 m3/d,內(nèi)容包括土建工程建設(shè)和污水處理設(shè)備制作和安裝調(diào)試,于 2008 年 12 月竣工驗(yàn)收。
This project is the first BOT project undertaken by our company. The water treatment of 50,000 m 3 / d includes civil engineering construction and sewage treatment equipment production, installation and commissioning, which was completed and accepted in December 2008.